Products Why TechnoCell Support Facility Safety & Quality Technical Notes News Membership
Member Login Contact

Stem cell secretome · β-NMN — for medical institutions

Advanced technology,
for every clinical setting.

Made by doctors, for doctors.

We are a specialist team of physicians and medical students,
brought together to deliver biomaterials that clinicians can truly rely on.

Products

Product Lineup

Cell-derived preparations manufactured in a proprietary culture medium free of animal-derived components, keeping impurities out from the manufacturing stage. Choose the format that suits your application and storage environment.

View pricing & specifications
Stem cell secretome (stem cell conditioned medium containing exosomes), freeze-dried
Freeze-driedRoom-temperature storage

Stem Cell Secretome

High-purity secretome free of medium-derived proteins. Stores at room temperature.

Volume
1mL
Source
Adipose / Deciduous tooth pulp / Umbilical cord
Storage
At room temperature, protected from light (up to 40°C)
Stem cell secretome (stem cell conditioned medium containing exosomes), liquid-frozen
Liquid-frozenFrozen storage

Stem Cell Secretome

Liquid format stored frozen. Ready to use right after thawing.

Volume
1mL
Source
Adipose / Deciduous tooth pulp / Umbilical cord
Storage
Frozen at -20°C or below
β-NMN (freeze-dried), 150mg / 300mg / 500mg
Freeze-driedRoom-temperature storage

β-NMN

High-purity β-NMN manufactured in Japan, at medical grade. Three sizes available.

Volume
150mg / 300mg / 500mg
Origin
Made in Japan
Storage
At room temperature, protected from light (up to 40°C)

Frequently asked questions about our products

Why TechnoCell

A supply system
scaled to your clinic.

Order quantities and lead times that never assume bulk stock, and a payment cycle that follows your revenue. We lower the burden of adoption through the design of our supply.

10+ vials

Minimum lot (1 box)

Order from a minimum of 10 vials

No risk of carrying bulk inventory. Procure only what you need, matched to your clinic's size and usage frequency. First-time adopters can start with a small lot.

  • Minimum order of 10 vials per box
  • Eliminates overstock risk
  • Supports step-by-step scale-up

Next day

Fastest delivery (usually within 2 business days)

Delivery as fast as the next day

Our own delivery system brings orders to you within 2 business days (next day at the fastest), preventing lost treatment opportunities caused by stock-outs.

  • Next-day delivery available from order
  • Usually within 2 business days
  • Minimizes stock-out risk

20th

Month-end closing, payment on the 20th of the following month

Payment due the 20th of the following month

A payment cycle that comes after your revenue: invoices close at month-end and are due on the 20th of the following month, so you can adopt continuously while keeping cash flow stable. We are also happy to discuss payment terms.

  • Month-end close, due the 20th of the next month
  • Stabilizes cash flow
  • Flexible payment terms negotiable

For product details, price lists, and sample requests

Contact / Request Information

Track record

12members

Physicians and medical students on staff

A specialist team of physicians and medical students contributes to product development and quality control from a clinical perspective.

42institutions

Partner medical institutions

We hold supply agreements with medical institutions across Japan, from clinics to hospitals.

* 12 is the combined number of physicians and medical students; 42 is based on executed supply agreements. Contact us for a breakdown and the latest figures.

Support

Physicians by your side,
from adoption to daily use.

Beyond supplying products, we maintain a support system grounded in medical expertise so that medical institutions can adopt and operate with confidence.

Staff member in a TechnoCell-branded lab coat looking into a microscope

Consultation

Adoption consultations with physicians

Our staff physicians respond directly, advising on appropriate product use and proposing adoption plans tailored to your clinic's circumstances, based on medical expertise.

Free consultations, available online

Entrance of the Ginza manufacturing facility

Facility tour

Manufacturing facility tours

See for yourself our manufacturing facility, equipped with a Class 10,000 cleanroom and Class 100 biosafety cabinets. Confirm our commitment to quality on site.

Book a tour

TechnoCell staff member in a lab coat presenting at a lectern with hand gestures

Staff training

Staff training for medical institutions

To support operations after adoption, we run training programs for your staff covering product handling, storage, and usage procedures.

On-site training and materials available

Manufacturing facility

A clinic-integrated CPC,
directly connected to Ginza Station.

Our CPC (cell processing center), integrated into a clinic, is located in Ginza, Tokyo. The quality of our products is born of this environment.

Entrance of the Ginza manufacturing facility
Cell processing room at the Ginza manufacturing facility
Location
Dai-1 Yayoi Bldg. B1, 4-2-2 Ginza, Chuo-ku, Tokyo
Access
Directly connected to Exit C8 of Ginza Station (Tokyo Metro)
Floor area
Approx. 330 m² (about 100 tsubo)
Cleanroom
Class 10,000
Biosafety cabinets
Class 100

First order flow

How your first order works

From inquiry to adoption in as little as 2 days.

  1. 01Step 1

    Contact us

    Reach us via the form on this page or by phone. Information requests, sample requests, and facility tour bookings are all handled here as well.

    Contact form

  2. 02Step 2

    Consultation

    A physician takes charge of your account directly, learns about your practice and intended use, and proposes products, volumes, and an ordering plan.

    • — Online or in person
    • — Explained directly by a physician
  3. 03Step 3

    Agreement

    We conclude a master supply agreement. Our framework under the Product Liability Act ensures that both the medical institution and its patients are properly protected should anything go wrong.

    Our approach to safety

    * Your representative will explain the contract terms and scope of coverage.

  4. 04Step 4

    Start using the product

    After you order, delivery is as fast as the next day. Because you can start with a small lot (minimum of 10 vials), you can scale up gradually while limiting inventory risk.

    Next-day delivery available Minimum of 10 vials Due the 20th of the next month

FAQ

Frequently Asked Questions

If your question is not answered here, please feel free to contact us.

Contact form

Contact

Contact and
Information Requests

For product details, price lists, sample requests, facility tour bookings, and more — please get in touch. A physician will respond to you directly.

  • Brochure and price list requests
  • Sample requests
  • Facility tour bookings
  • Adoption consultations
  • Other inquiries

We reply within 2 business days.

Please enter your institution's name
Please enter the contact person's name
Please enter a valid email address
Inquiry type Required
Please select at least one
Your agreement is required

Technical notes

Technical Notes

Explanations of our manufacturing methods, quality control, and related research, written for physicians at medical institutions.

View all
Contact